Power Electronics Engineer

mid$100K$250K

via Ashby

About this role

FIRST ORDER EFFECTS Power Electronics Engineer Infrastructure for the Autonomous Era · First in. First up. On-site · Austin, TX --------------------------------------------------- MESH is a power plant in a box, and power electronics is its heart. Your job is to design the inverter we build ourselves, and to own the conversion stage end to end. If you have taken switching converters from a blank schematic to hardware humming under real load, this is the machine you get to own. WHO WE ARE First Order Effects (FOE) is building America's Infrastructure Prime for the robotic era. Autonomous ships, drones, and robots are rewriting how the world moves, fights, and builds - but none of them work without infrastructure to power them, connect them, and launch and recover them.…

Read the full description on Firstordereffects's site →

What we'd score you on

reqspace match rubric

Five dimensions, recruiter-grade. Upload your resume and we'll generate a written explanation of where you fit and where the gaps are.

1

Skills match

We compare your skills against the role requirements.

2

Level fit

This role is mid-level. We check your trajectory against it.

3

Domain experience

Your work in the role's domain matters more than your years total. We weight recent and direct experience.

4

Recency

A skill you used last quarter weighs more than one from five years ago. We grade on recency, not lifetime.

5

Location fit

This role is based in a specific location. We weight your proximity and willingness to relocate.

Score yourself on this role.
Free · no card · written explanation included
See if I'm a fit →

More at Firstordereffects

See all open jobs at Firstordereffects